π SayPro Research and Development Plan
To Validate: SayPro AquaHarvest β Smart Atmospheric Water Harvesting System
1. π§ͺ Scientific Feasibility Study
A. Atmospheric Water Harvesting (AWH) Potential in Target Regions
- Objective: Determine if humidity and fog/dew conditions in SayPro priority areas (e.g., semi-arid parts of Southern Africa) are suitable.
- Actions:
- Analyze historical relative humidity and dew point data using meteorological databases (e.g., SAWS, NOAA, World Bank Climate Portal).
- Identify target regions with average RH > 60% and regular fog/dew occurrence.
- Use satellite tools (e.g., NASA POWER) for localized climate models.
B. Material Selection and Testing
- Objective: Identify the best mesh material for fog and dew collection.
- Materials to test:
- Polypropylene mesh (traditional fog nets)
- Nano-coated polyethylene with hydrophilic/hydrophobic patterns
- Graphene oxide and silica-based coatings for enhanced condensation
- Testing criteria:
- Water yield (liters/mΒ²/day)
- Durability under UV exposure
- Cost and availability in local markets
C. Scientific Prototyping
- Build 3 small-scale test units with different mesh types and geometries (vertical net vs. funnel design).
- Deploy prototypes in controlled outdoor environments for 30β60 days.
- Measure daily water yield, evaporation rate, and material wear.
2. βοΈ Technical Feasibility
A. Solar and Power Requirements
- Assess minimum solar wattage needed to power sensors and small fans (if active cooling is used).
- Choose efficient low-power microcontrollers (e.g., ESP32, Arduino with GSM/Lora).
- Test energy output from small PV panels (10Wβ30W) in SayPro regions.
B. IoT Sensor Integration
- Test DHT22 or BME280 sensors for humidity and temperature.
- Use flow meters (e.g., YF-S201) to measure collected water volume.
- Test data transmission via:
- GSM (2G) for rural areas
- LoRaWAN for community mesh networking
- Build a simple mobile dashboard (React Native or Android Studio prototype) with:
- Water collection graph
- Maintenance alerts
- Weather prediction integration via open APIs
3. π° Economic and Social Feasibility
A. Cost Analysis
- Estimate cost per unit at pilot scale (1β10 units):
- Frame: $10β20 (recycled aluminum or PVC)
- Mesh material: $5β10/mΒ²
- Solar panel + battery + controller: $25β50
- IoT sensors and microcontroller: $15β30
- Total estimated cost: $80β120 per unit
- Explore bulk procurement and local manufacturing to reduce costs by 30β40%.
B. User Acceptance and Usability Study
- Conduct surveys and interviews in target communities to understand:
- Water needs
- Attitudes toward new technologies
- Willingness to maintain and co-own units
- Engage SayPro Youth Clubs in co-design sessions using participatory development tools.
C. Training Program Prototype
- Develop a 1-week training module:
- Basic science of AWH
- IoT assembly and troubleshooting
- Environmental maintenance (cleaning, optimization)
- Pilot the training with 10 youth leaders and gather feedback.
4. π Pilot Evaluation Framework
KPIs for Feasibility Pilot (over 3 months):
Key Indicator | Target Value | Measurement Tool |
---|---|---|
Daily water yield | β₯ 10L/unit | Flow sensor log |
Cost per liter | β€ $0.05 | Cost divided by yield |
System uptime | > 90% | Sensor data logs |
Youth engagement | 80%+ satisfaction | Post-training surveys |
Maintenance frequency | β€ 2/month | Manual check logs |
5. π Partnerships for R&D Support
- Universities: Collaborate with Environmental Engineering or Physics departments for material testing.
- Local Innovators: Partner with local makerspaces or FabLabs for prototyping.
- NGOs/Donors: Approach organizations like WaterAid, CSIR (SA), or Innovation Edge for pilot funding.
- Government: Collaborate with local municipalities or Department of Water & Sanitation for site access.
6. ποΈ Timeline for R&D Phase
Phase | Timeline | Activities |
---|---|---|
Climate and Material Research | Weeks 1β2 | Data gathering, mesh selection |
Prototype Development | Weeks 3β5 | Assembly of test units |
Field Testing | Weeks 6β10 | Monitoring and data collection |
Economic & Social Feasibility | Weeks 6β9 | Community interviews, cost modeling |
Reporting & Recommendations | Weeks 11β12 | Consolidated feasibility report |
β Expected Outcome of R&D Phase
- Verified climatic suitability in SayPro regions
- Optimized design with best yield-cost ratio
- A pilot-ready technical prototype
- Trained group of SayPro youth innovators
- A data-backed feasibility report to inform scale-up and funding
Leave a Reply